Board Approves $126K in Infrastructure Contracts, Celebrates New Water Tank

Board Approves $126K in Infrastructure Contracts, Celebrates New Water Tank

Board of Directors • Coastside County Water DistrictAugust 11, 2026

Sources:

Locunity is an independent informational service and is not an official government page for this commission. All information is sourced from public footage and an analysis of official agendas with the aid of responsible, fact-checked AI. to report an error or omission.

The Coastside County Water District Board of Directors moved swiftly through three procurement items — a fleet truck, chemical feed pumps and a tree removal contract — while celebrating the completion of a major water tank project that drew more than 90 people and proclamations from federal, county and city officials. With President Bob Feldman's retirement on the horizon, two candidates for his seat attended the meeting, signaling a governance transition ahead.

  • Board authorizes $126,000+ in infrastructure spending across three procurement items for fleet, water treatment and fire safety
  • Ribbon-cutting for new Half Moon Bay water tank draws 90+ attendees and proclamations from a congressman, county supervisor and mayor
  • Director reports "room for optimism" on negotiated settlement with regional water wholesaler BAWSCA
  • Two candidates attend board meeting as President Feldman's retirement approaches

$50K Tree Removal Contract Aims to Protect Water Tanks From Wildfire

The board unanimously approved a $50,000 sole-source contract with Brush Hog Tree Care Inc. for vegetation management and hazardous tree removal near the Half Moon Bay Tank 1 site — the same facility that just celebrated its ribbon-cutting.

Why it matters: Overgrown vegetation around water storage infrastructure creates both wildfire risk and physical debris damage to tanks. The fire department is coordinating with the district on the work, which will lower tree canopies and push back brush to create a firebreak.

Where things stand: Staff explained that substantial vegetation clearing was done before construction of the new tank, but a year of maintenance was missed during the construction period. Rather than sending workers into the dense tree line, the contractor will use specialized crane equipment positioned on newly paved areas to reach, cut and remove trees from a safe distance.

"They can get in there and reach and cut back the trees that are on our property without having to put guys in there to fell the trees right on top of other trees, so they're able to pluck and pull them over," said operations staff.

Director Ken Coverdell raised an environmental concern, asking whether the work would comply with raptor nesting season restrictions. "Are we out of the raptor nesting time period to have someone evaluated that for the permission to do this work?" he asked. Staff confirmed the nesting period typically ends in late July and committed to verifying compliance before work begins.

Decisions: The contract was approved as a sole-source procurement under Resolution 2025-07. (For: 5, Against: 0)


New Water Tank Ribbon-Cutting Draws Crowd, Three Proclamations

General Manager Mary Rogren reported that the ribbon-cutting celebration for the district's new water tank was an overwhelming success, with more than 90 attendees from across local, county, state and federal agencies.

"We had over 90 people attend, largely made up of staff from the city of Half Moon Bay, the county, the fire. We had our regulators from the state each even come," said General Manager Rogren. She added: "I would like to openly thank all of our staff, because every single person contributed."

The district received three proclamations — from Congressman Ricardo's office, Supervisor Mueller's office and Mayor Reddick on behalf of the city. SFPUC representative Steve Ritchie also attended.

Vice President John Miller quipped that "we're going to need a bigger building here for all the proclamations we keep receiving, which is a good sign."

President Feldman described the event in broader terms: "This is an affirmation of all the efforts of all the people, the management, the staff, the board of directors and the public who participated in making this happen."

The celebration marks the conclusion of a multi-year capital project to modernize the district's water storage infrastructure — and the tree removal contract approved earlier in the meeting will help protect the investment.


$33K Pump Replacement Targets Worker Safety at Water Treatment Plant

The board approved a $33,000 purchase of four Watson Marlow peristaltic pumps to replace aging hypochlorite chemical feed pumps at the Denniston Water Treatment Plant.

The basics: Hypochlorite, used in water treatment disinfection, is highly corrosive to mechanical equipment. The existing pumps, installed during a 2013 plant upgrade, have reached their expected 5-to-10-year lifespan and are deteriorating.

Why it matters: The new pumps feature a design that allows workers to swap pump heads without direct contact with the hazardous chemical — a meaningful safety improvement. Staff recommended the Watson Marlow brand based on successful experience replacing permanganate pumps the previous year. Four pumps are required because the peristaltic style has lower individual output than the units being replaced.

"This new wave design with what the Watson Marlow pumps makes, where we are able just to take off the pump head and swap it out and really keep us away from the chemical itself," said operations staff.

Vice President Miller asked about vendor locations; the sales company is local, while Watson Marlow is an international manufacturer.

Decisions: Passed unanimously. (For: 5, Against: 0)


BAWSCA Settlement Talks Show "Room for Optimism"

Director Chris Mickelsen reported on a private meeting with Tom Smigel, CEO of BAWSCA (Bay Area Water Supply and Conservation Agency), describing it as "a very productive meeting, actually a little room for optimism on the negotiated settlement moving forward."

Why it matters: A successful settlement with the regional water wholesaler could stabilize the district's wholesale water costs and resolve longstanding supply contract disputes that affect ratepayers. Mickelsen emphasized the value of a private setting where both sides could share candid thoughts about how negotiations should proceed.


Feldman Retirement Opens Board Seat; Two Candidates Attend

Director Ken Coverdell took time to welcome two members of the public who are running for a seat on the board. Coverdell spoke at length about the quality of the district and its staff, noting the long tenures of current members — including Vice President Miller's multiple terms, Director Mickelsen's approximately 25 years of service and Director Dave Dixon's prior role as general manager.

"I've been involved for way too long probably, but I've learned more than I've brought to the party and I'm proud of that," Coverdell said.

President Feldman, who announced in June his plans to retire, expressed satisfaction that qualified community members had stepped forward. "I am so happy to be proven right in that prediction," he said.

Legal counsel clarified procedural considerations about whether to reopen public comments for the candidates, and the board ultimately proceeded to closed session without allowing remarks. The board then entered closed session for a public employee appointment discussion under Government Code section 54957.


Minor Items

  • Consent calendar approved unanimously, covering accounts payable and prior month expenses. (For: 4, Against: 0, Absent: 1 — Coverdell not recorded in roll call)
  • Fleet truck purchase: Board authorized procurement of a 2027 Ford F-150 4x4 standard cab pickup from Town Ford for $43,619, part of the annual capital improvement vehicle replacement program. Director Mickelsen praised staff for stretching vehicle life. (For: 4, Against: 0, Absent: 1 — Coverdell not recorded in roll call)
  • Well testing by PG&E expected to be completed this month.
  • Residual control system installed and operational at El Granada Tank 3, with staff trained.
  • Floc and settled basins at the Newniss facility drained and cleaned on regular schedule.
  • Hurricane blower installed atop the new concrete tank to aid in TTHM (total trihalomethane) removal.
  • Two hydrants replaced at Amesport Landing, converting wet well to dry well configurations. Director Coverdell confirmed these were replacements, not new installations. Vice President Miller thanked staff for resolving a fire hydrant coordination issue with the fire district.